Garage conversion
Assess the structure, moisture conditions and work needed to create living space.
Accessory dwelling units designed and built for your property, from a garage conversion to a detached unit.
ADU Construction in Redmond, Bellevue and the Eastside.
These are project types, not an assumed order of price. Site work and existing conditions can change the comparison.
An ADU is a small house with all the systems of a full one: foundation or conversion work, framing, plumbing, electrical, heating, a kitchen and a bathroom, plus its own permits and inspections. Whether it is a detached unit, an attached addition or a garage conversion, the build quality has to match the main home, because it becomes part of your property's value and daily life.
The honest starting point is your lot, not a floor plan. Size limits, setbacks, parking and utility connection rules are set city by city across the Eastside and Puget Sound, and they can differ lot by lot. We research what applies to your address, walk the property to check access and where sewer, water and power run, and only then talk about design and budget.
Once the site picture is clear, the process runs like our other work: a written, itemized estimate and schedule before construction, one point of contact through permits, inspections and the build, and a final walkthrough of the finished unit. We do not quote feasibility or approval timelines before seeing the property, because guessing at either one helps nobody.
Detached, attached, or a garage conversion?
An illustration to start the conversation. Your layout and specifications follow a walkthrough of your own space.
A separate building provides physical separation from the main house. Planning starts with its location on the property, construction access and connections to utilities. Site work and the distance to existing services are important scope questions.
An attached unit connects to the existing home. Review how the addition or conversion meets the current building, where the entrance will be and how shared systems and privacy will work. Existing construction affects design options.
Converting a garage starts with assessing the structure and whether its floor, walls and roof are suitable for living space. Review moisture conditions, openings, insulation and utility routes before assuming the conversion is simpler than a new building.
Coordinate the unit layout with access, water, sewer and electrical planning. Identify the required design information and applications with the permitting authority for the property. Confirm current requirements for that address and scope before finalizing the plan.
A site visit to confirm access, utilities, and local requirements before we finalize any design or price. We do not promise approval timelines, since that depends on your specific city's process.
The items included in your project are defined in your written estimate.
Start with the address, available property records and intended use. Review the applicable authority, site constraints, utility locations and access for equipment. A useful concept depends on those findings; it does not establish permit approval.
Size limits are set locally and vary by city and lot, so we confirm this for your specific property rather than quoting a general number.
Permitting timelines are set by the local jurisdiction and can vary. We'll tell you what applies to your project once we know your city and scope, not before.
That depends on your local market and situation, which we're not positioned to advise on. We build to the plan you and your own research or advisor land on.
Yes. A new dwelling unit, detached, attached or a garage conversion, requires building permits and inspections, and utility connections can involve separate reviews. Requirements differ by city across King and Snohomish County, which is why we research your address before finalizing any design.
A typical ADU build runs in the range of a few months of on-site work once permits are in hand, scope dependent. Permit review time is set by your city and is outside our control, so we do not promise approval dates. We give you a construction schedule with the written estimate.
Almost always. Most of the work happens outside the main house, and we agree on access, working hours and staging before anything starts. Utility tie-ins are planned to keep interruptions short and scheduled, not surprises.
Related services, planning tools and the areas we build in.
Tell us what you would like to change. Adi visits, measures and listens, and you receive a written, itemized estimate with one point of contact from the first walkthrough to the final details.
WA Reg #AIMBUBL742DO · Bonded and insured ↗